Launcher Products Bitnami Documentationimaxe CLI Blog Contact

How to migrate to a new AMI without service interruptions

Updating the image that holds up your service does not have to mean a sleepless night or a maintenance page. With the right strategy you switch AMIs with zero downtime and a reverse gear always within reach.

Point lever beside a railway track
Point lever beside a railway track Photo: W.carter · Public domain · Wikimedia Commons

Changing the AMI your instances use is like changing the foundation of your service while it keeps running. Done badly it means outages; done well it is nearly invisible to the user. The good news: there are proven patterns that make this migration safe and reversible.

The common basis is not to edit live instances, but to launch new instances with the new AMI and shift traffic in a controlled way.

Before migrating: prepare the ground

  • Test the new AMI in a staging environment identical to production.
  • Reliable health checks: define checks that confirm a new instance is genuinely healthy.
  • Rollback plan: have the previous version and the procedure to return to it ready.
  • Observability: metrics and alerts to spot regressions instantly.

Zero-downtime migration strategies

StrategyHow it worksIdeal for
Rolling updateReplaces instances in batches, little by littleServices in an Auto Scaling Group
Blue/GreenYou stand up a new environment and switch traffic at onceMigrations with instant rollback
CanaryYou send a small percentage of traffic to the new versionValidating in production at low risk

Three patterns for changing AMIs without interrupting the service.

Rolling update

You update the Launch Template with the new AMI and the Auto Scaling Group replaces instances in waves: it launches new ones, waits for them to pass the health check and retires the old ones. Simple and with no extra infrastructure, although both versions coexist for a while.

Blue/Green

You stand up a parallel environment (green) with the new AMI while the current one (blue) keeps serving. Once green is validated, you redirect traffic at the load balancer or in DNS. If anything fails, you are back on blue in seconds. It is the pattern with the fastest rollback, at the cost of temporarily duplicating resources.

Canary

You send a small fraction of traffic to instances with the new AMI and observe. If the metrics hold, you raise the percentage progressively up to 100 %. It minimises the blast radius of an unexpected problem.

After migrating

  • Watch metrics and logs for a reasonable period before declaring the migration good.
  • Mark the old AMI as deprecated so it is not relaunched by mistake.
  • Document the deployed version and the reason for the change.
  • Do not delete the previous image immediately: keep it in case you need a rollback.

Frequently asked questions

Which strategy is best for zero downtime?

Blue/Green offers the fastest rollback; rolling update is simpler and cheaper; canary minimises risk by validating in production. The choice depends on your risk tolerance and your infrastructure budget.

Do I need to duplicate the infrastructure to migrate?

Only with blue/green, and temporarily. With rolling update or canary you reuse the same group and replace instances as you go, without duplicating the whole environment.

How do I guarantee I can go back?

Keep the previous AMI and its Launch Template, define reliable health checks and have the rollback procedure tested before starting the migration.

At imaxe.cloud we version our images so that migrating between versions is predictable and reversible.

blue/greenrolling updatecanaryauto scalingdeployment
IM

imaxe team

We build and maintain the catalog AMIs. When we publish a version, we run it in production before anyone else.

From the catalogue

AMIs related to this article

Keep reading

Related articles